Full erection packages
Where available, coordinate structural erection of the PEB kit — primary frames, secondary members, roof and wall panels, and trim — as a defined package on your quote.
Furnish · Deliver · Erect when available
We can put the building up when the project and region allow — or help your crew stay on sequence.
What we offer
Full erection, coordination, or help for your crew.
Where available, coordinate structural erection of the PEB kit — primary frames, secondary members, roof and wall panels, and trim — as a defined package on your quote.
Delivery timing, drawings, and field questions so the crew has the right sequence, parts, and contacts.
Guidance for experienced owner-builders or contracted erectors: drawings, part identification, and practical sequence notes so your team can erect correctly.
Support for specialty envelope work when specified — insulated metal panels (IMP), standing-seam roofs, liner panels, and related details that need careful installation sequence.
Scope & responsibilities
Typical roles — your sealed drawings and final quote control the contract. This is educational guidance, not a guarantee of every line item on every job.
Typically included / coordinated
Owner / site responsibilities
| Item | Typical PEB erection package | Typical owner / site |
|---|---|---|
| Primary & secondary steel | Erected when full package quoted | — |
| Roof / wall panels & trim | Installed per system | — |
| Foundation & anchor bolts | Reactions provided on drawings | Design, pour, and readiness |
| Site access & utilities | Coordinated timing only | Roads, pad, power as required |
| Permits & inspections | Support documents as applicable | Obtain permits; schedule inspections |
| Interiors / MEP | Outside shell erection scope | Owner or separate contractors |
How erection fits
Erection is a defined step in the PEB path — not an afterthought. We align it with your quote options from day one.
Size, use, location — and whether you want erection options included.
Code-aware PEB package, sealed drawings, and reactions for your foundation team.
Kit production and freight scheduled with site readiness in mind.
Full package, partner crew, or your crew with coordination support.
Weather-tight shell ready for interiors, doors, and owner finishes.
Why sequence matters
A PEB is a system. Sequence and fit-up affect plumbness, weather sealing, and how the building carries wind and snow.
Design your building in 3D first →Frames, bracing, secondaries, then panels — out of order work creates fit-up problems and rework.
Temporary and permanent bracing keep the structure plumb until the diaphragm is complete.
Panel laps, trim, and sealants must follow the system details for a durable envelope.
Proper lifts, fall protection, and installation practices protect people and the product system.
Availability
Full erection is quoted by site. Direct crews are strongest near our Bethpage office; partner crews are used when that is the better fit. Scope and timing vary.
We confirm what is realistic for your site on the quote — not before.
Next step
Tell us size, location, and whether you want full erection, coordination, or crew guidance. Or design the building in 3D first.